1. Transmission and distribution utilities; microgrids. A transmission and distribution utility or a person that constructs, maintains or operates a new microgrid approved in accordance with section 3351, subsection 3 may construct and maintain its lines in, upon, along, over, across or under the roads and streets in any municipality in which it is authorized to supply electricity, subject to the conditions and restrictions provided in this chapter and chapter 25.

[PL 2021, c. 236, §3 (AMD).]

Ask a business law question, get an answer ASAP!
Thousands of highly rated, verified business lawyers.
Click here to chat with a lawyer about your rights.

Terms Used In Maine Revised Statutes Title 35-A Sec. 2305-B

  • Commission: means the Public Utilities Commission. See Maine Revised Statutes Title 35-A Sec. 102
  • Damages: Money paid by defendants to successful plaintiffs in civil cases to compensate the plaintiffs for their injuries.
  • in writing: include printing and other modes of making legible words. See Maine Revised Statutes Title 1 Sec. 72
  • Lien: A claim against real or personal property in satisfaction of a debt.
  • Municipality: includes cities, towns and plantations, except that "municipality" does not include plantations in Title 10, chapter 110, subchapter IV; or Title 30?A, Part 2. See Maine Revised Statutes Title 1 Sec. 72
  • Person: includes a corporation, partnership, limited partnership, limited liability company, limited liability partnership, association, trust, estate, any other legal entity or natural person. See Maine Revised Statutes Title 35-A Sec. 102
  • Public utility: includes every gas utility, natural gas pipeline utility, transmission and distribution utility, telephone utility, water utility and ferry, as those terms are defined in this section, and each of those utilities is declared to be a public utility. See Maine Revised Statutes Title 35-A Sec. 102
  • Real estate: includes lands and all tenements and hereditaments connected therewith, and all rights thereto and interests therein. See Maine Revised Statutes Title 1 Sec. 72
  • Transmission and distribution utility: means a person, its lessees, trustees or receivers or trustees appointed by a court, owning, controlling, operating or managing a transmission and distribution plant for compensation within the State, except where the electricity is distributed by the entity that generates the electricity through private property alone solely for the use of:
A. See Maine Revised Statutes Title 35-A Sec. 102
  • Year: means a calendar year, unless otherwise expressed. See Maine Revised Statutes Title 1 Sec. 72
  • 2. Persons other than transmission and distribution utilities or person that constructs, maintains or operates new microgrid. A person other than a transmission and distribution utility or person that constructs, maintains or operates a new microgrid approved in accordance with section 3351, subsection 3 may not construct or maintain electric lines, including poles or other related structures, in, upon, along, over, across or under a road, street or other public way unless:
    A. The person satisfies the requirements of section 2503; [PL 2001, c. 110, §2 (NEW).]
    B. The person or the person’s contractor hired to construct the line provides to the applicable licensing authority a performance bond:

    (1) In the amount of the value of the line, including poles or other related structures, to be located in the public way; and
    (2) That is enforceable for one year from the date the line is energized; [PL 2001, c. 110, §2 (NEW).]
    C. Prior to constructing the line, the person notifies the transmission and distribution utility in whose service territory the line is proposed to be built of the proposed location of the line; and [PL 2001, c. 110, §2 (NEW).]
    D. If a public utility objects to the line on the basis that it may constitute a duplication of existing transmission or distribution facilities or may interfere with the adequate and safe delivery of electricity to others, the commission issues a finding that the line is not a duplication of existing transmission or distribution facilities and does not interfere with the adequate and safe delivery of electricity to others. A finding is not required under this paragraph unless a public utility has objected in writing to the applicable licensing authority. [PL 2001, c. 110, §2 (NEW).]

    [PL 2021, c. 236, §4 (AMD).]

    3. Recording. A public utility that enters into any written agreement with the owner of a facility with regard to that facility shall record that agreement in the registry of deeds in the county in which the facility is placed.

    [PL 2001, c. 110, §2 (NEW).]

    4. Maintenance. The owner of a line located in, upon, along, over, across or under a road, street or other public way is responsible for properly maintaining the line and complying with lawful directives of the applicable licensing authority. If the owner of a line fails to maintain a line properly or to comply with directives of the applicable licensing authority and the applicable licensing authority incurs any expense in maintaining the line or pays any damages as a result of the owner’s failure to maintain the line properly or to comply with the directives of the licensing authority, the licensing authority may assess the owner of the line the amount of those actual costs. The assessment must be in writing and must specify the amount of the assessment, the basis for the assessment and that a lien will be created on the real estate of the owner of the line if the assessment is not paid within 90 days. If the owner of the line does not pay the assessment within 90 days, a lien is created on the real estate of the owner of the line situated in the municipality to secure the payment of actual costs incurred by the applicable licensing authority. This lien may be treated and enforced in the same manner as a tax lien under Title 36, chapter 105, subchapter IX, article 2. In addition to any other available remedies, a person aggrieved by a lien imposed or enforced by a licensing authority under this subsection may bring an action in Superior Court for a determination of the validity of the lien.

    [PL 2001, c. 110, §2 (NEW).]

    5. Energizing lines. A transmission and distribution utility may not deliver electricity over any line in, upon, along or under a road, street or other public way if the lines or related structures were constructed by a person other than a transmission and distribution utility unless the transmission and distribution utility is provided with certified copies of applicable permits required under section 2503. A transmission and distribution utility may not refuse to deliver electricity over a line if:
    A. The owner of the line reimburses the transmission and distribution utility for the cost of connecting the line to the utility’s system; and [PL 2001, c. 110, §2 (NEW).]
    B. The line meets the transmission and distribution utility’s standards, provided those standards are no different from the standards the utility applies to its own lines. [PL 2001, c. 110, §2 (NEW).]

    [PL 2001, c. 110, §2 (NEW).]

    SECTION HISTORY

    PL 2001, c. 110, §2 (NEW). PL 2021, c. 236, §§3, 4 (AMD).