14 USC 1156 – Limitation on unmanned aircraft systems
(a)
(1) may not award a contract for design of an unmanned aircraft system for use by the Coast Guard; and
(2) may lease, acquire, or acquire the services of an unmanned aircraft system only if such system—
(A) has been part of a program of record of, procured by, or used by a Federal entity (or funds for research, development, test, and evaluation have been received from a Federal entity with regard to such system) before the date on which the Commandant leases, acquires, or acquires the services of the system; and
(B) is leased, acquired, or utilized by the Commandant through an agreement with a Federal entity, unless such an agreement is not practicable or would be less cost-effective than an independent contract action by the Coast Guard.
Terms Used In 14 USC 1156
- Contract: A legal written agreement that becomes binding when signed.
- Fiscal year: The fiscal year is the accounting period for the government. For the federal government, this begins on October 1 and ends on September 30. The fiscal year is designated by the calendar year in which it ends; for example, fiscal year 2006 begins on October 1, 2005 and ends on September 30, 2006.
- Lease: A contract transferring the use of property or occupancy of land, space, structures, or equipment in consideration of a payment (e.g., rent). Source: OCC
(b)
(c)