§ 63B-31-101 General obligation bonds — Maximum amount — Use of proceeds for projects
§ 63B-31-102 Transportation bonds — Maximum amount — Use for transportation projects and related facilities
§ 63B-31-103 Transportation bonds — Maximum amount — Use for State Infrastructure Bank Fund loans

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Utah Code > Title 63B > Chapter 31 > Part 1 - 2021 Transportation and Transit General Obligation Bonds

  • City: includes , depending on population, a metro township as defined in Section 10-3c-102. See Utah Code 68-3-12.5
  • Commission: means the State Bonding Commission created in Section 63B-1-201. See Utah Code 63B-1-101
  • Equal: means , with respect to biological sex, of the same value. See Utah Code 68-3-12.5
  • Interest rate: The amount paid by a borrower to a lender in exchange for the use of the lender's money for a certain period of time. Interest is paid on loans or on debt instruments, such as notes or bonds, either at regular intervals or as part of a lump sum payment when the issue matures. Source: OCC
  • Land: includes :
         (18)(a) land;
         (18)(b) a tenement;
         (18)(c) a hereditament;
         (18)(d) a water right;
         (18)(e) a possessory right; and
         (18)(f) a claim. See Utah Code 68-3-12.5
  • Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.
  • State: when applied to the different parts of the United States, includes a state, district, or territory of the United States. See Utah Code 68-3-12.5