Washington Code 43.21A.610 – Steam electric generating plant — Study — Construction
Current as of: 2023 | Check for updates
|
Other versions
The director shall continue the study of the state power commission made in 1956 relating to the construction of a steam power electric generating plant, and if the construction of a steam electric generating plant is found to be feasible by the director, the director may construct such plant at a site determined by him or her to be feasible and operate it as a state owned facility.
[ 2009 c 549 § 5088; 1988 c 127 § 10; 1965 c 8 § 43.21.250. Prior: 1957 c 275 § 3. Formerly RCW 43.21.250.]
Terms Used In Washington Code 43.21A.610
- Commission: means the ecological commission. See Washington Code 43.21A.030
- Director: means the director of the department of ecology. See Washington Code 43.21A.030