(1)(a) A facility that receives crude oil from a railroad car must provide advance notice to the department that the facility will receive crude oil from a railroad car, as provided in this section. The advance notice must include the route taken to the facility within the state, if known, and the scheduled time, location, volume, region per bill of lading, type, vapor pressure, and gravity as measured by standards developed by the American petroleum institute, of crude oil received. Each week, a facility that provides advance notice under this section must provide the required information regarding the scheduled arrival of railroad cars carrying crude oil to be received by the facility in the succeeding seven-day period. A facility is not required to provide advance notice when there is no receipt of crude oil from a railroad car scheduled for a seven-day period.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

(b) Twice per year, pipelines that transport crude oil must report to the department the following information about the crude oil transported by the pipeline through the state: The volume of crude oil, gravity of the crude oil as measured by standards developed by the American petroleum institute, type of crude oil, and the state or province of origin of the crude oil. This report must be submitted each year by July 31st for the period January 1st through June 30th and by January 31st for the period July 1st through December 31st.
(2) The department may share information provided by a facility through the advance notice system established in this section with the state emergency management division and any county, city, tribal, port, or local government emergency response agency upon request.
(3) The department must publish information collected under this section on a quarterly basis on the department’s internet website. With respect to the information reported under subsection (1)(a) of this section, the information published by the department must be aggregated on a statewide basis by route through the state, by week, and by type of crude oil. The report may also include other information available to the department including, but not limited to, place of origin, modes of transport, number of railroad cars delivering crude oil, and number and volume of spills during transport and delivery.
(4) To further strengthen rail safety and the transportation of crude oil, the department must provide to the utilities and transportation commission data reported by facilities on the characteristics, volatility, vapor pressure, and volume of crude oil transported by rail, as required under subsection (1)(a) of this section.
(5) A facility providing advance notice under this section is not responsible for meeting advance notice time frame requirements under subsection (1) of this section in the event that the schedule of arrivals of railroad cars carrying crude oil changes during a seven-day period.
(6) Consistent with the requirements of chapter 42.56 RCW, the department and any state, local, tribal, or public agency that receives information provided under this section may not disclose any such information to the public or to nongovernmental entities that contains proprietary, commercial, or financial information unless that information is aggregated. The requirement for aggregating information does not apply when information is shared by the department with emergency response agencies as provided in subsection (2) of this section.
(7) The department shall adopt rules to implement this section. The advance notice system required in this section must be consistent with the oil transfer reporting system adopted by the department pursuant to RCW 88.46.165.

NOTES:

Reviser’s note: This section was amended by 2019 c 289 § 7 and by 2019 c 354 § 2, each without reference to the other. Both amendments are incorporated in the publication of this section under RCW 1.12.025(2). For rule of construction, see RCW 1.12.025(1).
FindingIntent2019 c 289: See note following RCW 88.16.190.
Effective date2015 c 274: See note following RCW 90.56.005.