Idaho Code 54-5020 – Request for Inspection — Fee for Reinspection
Current as of: 2023 | Check for updates
|
Other versions
(1) It shall be the duty of the permit holder to notify the division of occupational and professional licenses at least one (1) day prior to the desired inspection, Sundays and holidays excluded, that the project is ready for inspection. If a reinspection is required after the final inspection due to a failure to meet requirements of this chapter, a fee not to exceed the actual cost of reinspection shall be charged.
(2) Local governments that have adopted mechanical codes shall by ordinance establish times within which permit holders shall notify the authority of the desire for an inspection.