21 Guam Code Ann. § 681201
COL2132017
21 Guam Code Ann. REAL PROPERTY
CH. 68 USE & DEVELOPMENT OF GOVERNMENT REAL PROPERTY
(b) Upon conclusion of the survey, the Director of Public Works shall submit a report to I Maga=lahen Guåhan and the Speaker of I Liheslaturan Guåhan. Such report shall contain, at a minimum, a comprehensive and detailed map of all areas in Guam surveyed, a detailed description of each area included in the survey, causal and contributory factors that lead to or otherwise exacerbate flooding in areas surveyed, mitigating measures that are recommended to eliminate or severely reduce the threat of flooding in areas surveyed, in the absence of plausible mitigating efforts, recommendations for relocation inclusive of recommendations for land exchanges or purchases, and all estimated costs associated with mitigating efforts or ameliorative solutions. Such report shall be submitted no later than ninety (90) days after the conclusion of the survey, except that failure to meet such deadline shall not be construed as relieving the Department of its mandate to complete the report required herein.
———
ARTICLE 13
MANENGGON MEMORIAL