South Carolina Code 44-96-380. Land application facilities; composting facilities; construction, demolition, and land clearing debris landfills
Current as of: 2023 | Check for updates
|
Other versions
(A) Not later than eighteen months after this article is effective, the department shall promulgate regulations establishing minimum standards for land application facilities and composting facilities. The regulations shall, at a minimum, establish operational requirements and siting requirements. The department may, by regulation, exempt certain facilities from all or part of the requirements of this section.
(B) Not later than eighteen months after this article is effective, the department shall promulgate regulations establishing minimum standards for construction, demolition, and land clearing debris landfills. The department may, by regulation, exempt certain sites or facilities from all or part of the requirements of this section. The department shall exempt a landfill for the disposal of trees, stumps, wood chips, and yard waste when generation and disposal of such waste occurs on properties under the same ownership or control. The regulation shall, at a minimum, contain the following requirements:
Terms Used In South Carolina Code 44-96-380
- Department: means the South Carolina Department of Health and Environmental Control. See South Carolina Code 44-96-40
- Disposal: means the discharge, deposition, injection, dumping, spilling or placing of any solid waste into or on any land or water, so that the substance or any constituent thereof may enter the environment or be emitted into the air or discharged into any waters, including groundwater. See South Carolina Code 44-96-40
- Generation: means the act or process of producing solid waste. See South Carolina Code 44-96-40
- Landfill: means a disposal facility or part of a facility where solid waste is placed in or on land, and which is not a land treatment facility, a surface impoundment, or an injection well. See South Carolina Code 44-96-40
(1) site selection;
(2) construction;
(3) hydrogeologic;
(4) operation; and
(5) closure and postclosure.