(1) A proposed final order issued under ORS § 537.170 (6) for an in-stream water right certificate may include any condition the Water Resources Director considers necessary, but which is consistent with the intent of ORS § 537.332 to 537.360. The proposed final order may:

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

(a) Approve the in-stream water right for the quantity of water requested;

(b) Approve the requested in-stream water right for a lesser quantity of water; or

(c) Reject the requested in-stream water right.

(2) If the director reduces or rejects the in-stream water right as requested, or conditions the in-stream water right, the director shall include a statement of findings that sets forth the basis for the reduction, rejection or conditions. The director shall be the final authority in determining the level of in-stream flow necessary to protect the public use.

(3) After the director issues a final order approving an in-stream water right, the Water Resources Department shall issue a certificate for an in-stream water right according to the provisions of ORS § 537.341. [1987 c.859 § 7; 1995 c.416 § 20]

 

[Formerly 537.300; renumbered 537.400 in 1987]