(1) Whenever a district has adopted, as the engineering plan for a subdistrict, a project work plan prepared for the subdistrict by a department of the federal government, and in connection with the development of such plan desires to borrow money from any state or federal agency, such district may, in lieu of levying a preliminary assessment, and with the approval of the electors of the subdistrict, enter into a loan contract with such agency.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Oregon Statutes 553.750

  • Contract: A legal written agreement that becomes binding when signed.
  • Court: means the county court having jurisdiction over a water control district and includes the board of county commissioners. See Oregon Statutes 553.010
  • District: means a water control district created under this chapter. See Oregon Statutes 553.010
  • Engineering plan: means the plans and specifications for the works to be constructed or purchased within any subdistrict, including such maps, profiles, plans and other data as may be necessary to set forth the location, character of the work, the property benefited, taken or damaged, showing any and all rights of way or other property which may be required for the construction of any works, together with the estimates of the cost of the works and an estimate of the benefits and damages which will accrue to each tract of land within a subdistrict upon the construction or purchase of the works. See Oregon Statutes 553.010
  • Record: means to file a document for recording with the county clerk of each county in which the lands within a district or subdistrict are located. See Oregon Statutes 553.010
  • tract of land: means real property, together with improvements thereon, whether publicly or privately owned, within a district. See Oregon Statutes 553.010
  • Works: means dams, storage reservoirs, canals, ditches, dikes, levees, revetments, and all other structures, facilities, improvements and property necessary or convenient for draining land, controlling flood or surface waters, or supplying lands with water for irrigation, domestic or other purposes. See Oregon Statutes 553.010
  • Writ: A formal written command, issued from the court, requiring the performance of a specific act.

(2) The loan contract shall be in such form and shall contain such terms as may be agreed upon by the agency and the district; the district may agree to levy a construction assessment against each tract of land benefited within the subdistrict, to do all acts and things necessary therefor, to assign to the lending agency the construction assessments as security for the loan and to perform all such acts within such period of time as may be agreed to between the district and the state or federal lending agency.

(3) In the event that a state or federal lending agency pays over money to a district pursuant to the terms of a loan contract and the district fails, refuses or neglects to levy the construction assessments, to obtain or prepare a benefit roll, to assign the construction assessments, or in any other manner not to perform as it agreed to under the loan contract, the state or federal lending agency shall have the right, at its election, to apply to the circuit court for the county in which is located the largest part of the lands within the subdistrict for a writ of mandamus, or any other order or writ, to require the district, its directors, officers and agents to do such acts and things as the district agreed to do under the terms of the loan contract. All costs, charges and expenses pertaining to the issuance and execution of any such writ or order shall be charged to and collected from the lands subject to the construction assessments in addition to such construction assessments.

(4) Upon the execution of a loan contract, the district shall record with the county clerk for the county in which the lands within the subdistrict are located, a certificate which shall state the date of the loan contract, the maximum amount of the loan, the recording data pertaining to the recorded order creating the subdistrict, the term of the loan and the rate of interest. Such certificate shall give notice that all lands within the subdistrict determined to be benefited by the construction of the works referred to in the engineering plan will be subject to construction assessments thereafter to be levied. [1961 c.186 § 2; 1991 c.459 § 432a]