42 USC 6966a – Increased use of recovered mineral component in federally funded projects involving procurement of cement or concrete
(a) Definitions
In this section:
(1) Agency head
The term “agency head” means—
(A) the Secretary of Transportation; and
(B) the head of each other Federal agency that on a regular basis procures, or provides Federal funds to pay or assist in paying the cost of procuring, material for cement or concrete projects.
(2) Cement or concrete project
The term “cement or concrete project” means a project for the construction or maintenance of a highway or other transportation facility or a Federal, State, or local government building or other public facility that—
(A) involves the procurement of cement or concrete; and
(B) is carried out in whole or in part using Federal funds.
(3) Recovered mineral component
The term “recovered mineral component” means—
(A) ground granulated blast furnace slag other than lead slag;
(B) coal combustion fly ash;
(C) blast furnace slag aggregate other than lead slag aggregate;
(D) silica fume; and
(E) any other waste material or byproduct recovered or diverted from solid waste that the Administrator, in consultation with an agency head, determines should be treated as recovered mineral component under this section for use in cement or concrete projects paid for, in whole or in part, by the agency head.
(b) Implementation of requirements
(1) In general
Not later than 1 year after August 10, 2005, the Administrator and each agency head shall take such actions as are necessary to implement fully all procurement requirements and incentives in effect as of August 10, 2005 (including guidelines under section 6962 of this title) that provide for the use of cement and concrete incorporating recovered mineral component in cement or concrete projects.
(2) Priority
In carrying out paragraph (1) an agency head shall give priority to achieving greater use of recovered mineral component in cement or concrete projects for which recovered mineral components historically have not been used or have been used only minimally.
(3) Conformance
The Administrator and each agency head shall carry out this subsection in accordance with section 6962 of this title.
(c) Full implementation study
(1) In general
The Administrator, in cooperation with the Secretary of Transportation and the Secretary of Energy, shall conduct a study to determine the extent to which current procurement requirements, when fully implemented in accordance with subsection (b), may realize energy savings and environmental benefits attainable with substitution of recovered mineral component in cement used in cement or concrete projects.
(2) Matters to be addressed
The study shall—
(A) quantify the extent to which recovered mineral components are being substituted for Portland cement, particularly as a result of current procurement requirements, and the energy savings and environmental benefits associated with that substitution;
(B) identify all barriers in procurement requirements to greater realization of energy savings and environmental benefits, including barriers resulting from exceptions from current law; and
(C)(i) identify potential mechanisms to achieve greater substitution of recovered mineral component in types of cement or concrete projects for which recovered mineral components historically have not been used or have been used only minimally;
(ii) evaluate the feasibility of establishing guidelines or standards for optimized substitution rates of recovered mineral component in those cement or concrete projects; and
(iii) identify any potential environmental or economic effects that may result from greater substitution of recovered mineral component in those cement or concrete projects.
(3) Report
Not later than 30 months after August 10, 2005, the Administrator shall submit to Congress a report on the study.
(d) Additional procurement requirements
Terms Used In 42 USC 6966a
- Administrator: means the Administrator of the Environmental Protection Agency. See 42 USC 6903
- Federal agency: means any department, agency, or other instrumentality of the Federal Government, any independent agency or establishment of the Federal Government including any Government corporation, and the Government Publishing Office. See 42 USC 6903
- solid waste: means any garbage, refuse, sludge from a waste treatment plant, water supply treatment plant, or air pollution control facility and other discarded material, including solid, liquid, semisolid, or contained gaseous material resulting from industrial, commercial, mining, and agricultural operations, and from community activities, but does not include solid or dissolved material in domestic sewage, or solid or dissolved materials in irrigation return flows or industrial discharges which are point sources subject to permits under section 1342 of title 33, or source, special nuclear, or byproduct material as defined by the Atomic Energy Act of 1954, as amended (68 Stat. See 42 USC 6903
- State: means any of the several States, the District of Columbia, the Commonwealth of Puerto Rico, the Virgin Islands, Guam, American Samoa, and the Commonwealth of the Northern Mariana Islands. See 42 USC 6903
Unless the study conducted under subsection (c) identifies any effects or other problems described in subsection (c)(2)(C)(iii) that warrant further review or delay, the Administrator and each agency head shall, not later than 1 year after the release of the report in accordance with subsection (c)(3), take additional actions authorized under this chapter to establish procurement requirements and incentives that provide for the use of cement and concrete with increased substitution of recovered mineral component in the construction and maintenance of cement or concrete projects, so as to—
(1) realize more fully the energy savings and environmental benefits associated with increased substitution; and
(2) eliminate barriers identified under subsection (c).
(e) Effect of section
Nothing in this section affects the requirements of section 6962 of this title (including the guidelines and specifications for implementing those requirements).