(a) Proposed plan

Before adoption of any plan for remedial action to be undertaken by the President, by a State, or by any other person, under section 9604, 9606, 9620, or 9622 of this title, the President or State, as appropriate, shall take both of the following actions:

(1) Publish a notice and brief analysis of the proposed plan and make such plan available to the public.

(2) Provide a reasonable opportunity for submission of written and oral comments and an opportunity for a public meeting at or near the facility at issue regarding the proposed plan and regarding any proposed findings under section 9621(d)(4) of this title (relating to cleanup standards). The President or the State shall keep a transcript of the meeting and make such transcript available to the public.


The notice and analysis published under paragraph (1) shall include sufficient information as may be necessary to provide a reasonable explanation of the proposed plan and alternative proposals considered.

(b) Final plan

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In 42 USC 9617

  • facility: means (A) any building, structure, installation, equipment, pipe or pipeline (including any pipe into a sewer or publicly owned treatment works), well, pit, pond, lagoon, impoundment, ditch, landfill, storage container, motor vehicle, rolling stock, or aircraft, or (B) any site or area where a hazardous substance has been deposited, stored, disposed of, or placed, or otherwise come to be located. See 42 USC 9601
  • national contingency plan: means the national contingency plan published under section 311(c) 4 of the Federal Water Pollution Control Act or revised pursuant to section 9605 of this title. See 42 USC 9601
  • person: means an individual, firm, corporation, association, partnership, consortium, joint venture, commercial entity, United States Government, State, municipality, commission, political subdivision of a State, or any interstate body. See 42 USC 9601
  • release: means any spilling, leaking, pumping, pouring, emitting, emptying, discharging, injecting, escaping, leaching, dumping, or disposing into the environment (including the abandonment or discarding of barrels, containers, and other closed receptacles containing any hazardous substance or pollutant or contaminant), but excludes (A) any release which results in exposure to persons solely within a workplace, with respect to a claim which such persons may assert against the employer of such persons, (B) emissions from the engine exhaust of a motor vehicle, rolling stock, aircraft, vessel, or pipeline pumping station engine, (C) release of source, byproduct, or special nuclear material from a nuclear incident, as those terms are defined in the Atomic Energy Act of 1954 [42 U. See 42 USC 9601
  • remedial action: means 2 those actions consistent with permanent remedy taken instead of or in addition to removal actions in the event of a release or threatened release of a hazardous substance into the environment, to prevent or minimize the release of hazardous substances so that they do not migrate to cause substantial danger to present or future public health or welfare or the environment. See 42 USC 9601
  • removal: means 2 the cleanup or removal of released hazardous substances from the environment, such actions as may be necessary taken in the event of the threat of release of hazardous substances into the environment, such actions as may be necessary to monitor, assess, and evaluate the release or threat of release of hazardous substances, the disposal of removed material, or the taking of such other actions as may be necessary to prevent, minimize, or mitigate damage to the public health or welfare or to the environment, which may otherwise result from a release or threat of release. See 42 USC 9601
  • response: means 2 remove, removal, remedy, and remedial action. See 42 USC 9601
  • Settlement: Parties to a lawsuit resolve their difference without having a trial. Settlements often involve the payment of compensation by one party in satisfaction of the other party's claims.
  • State: include the several States of the United States, the District of Columbia, the Commonwealth of Puerto Rico, Guam, American Samoa, the United States Virgin Islands, the Commonwealth of the Northern Marianas, and any other territory or possession over which the United States has jurisdiction. See 42 USC 9601
  • Transcript: A written, word-for-word record of what was said, either in a proceeding such as a trial or during some other conversation, as in a transcript of a hearing or oral deposition.

Notice of the final remedial action plan adopted shall be published and the plan shall be made available to the public before commencement of any remedial action. Such final plan shall be accompanied by a discussion of any significant changes (and the reasons for such changes) in the proposed plan and a response to each of the significant comments, criticisms, and new data submitted in written or oral presentations under subsection (a).

(c) Explanation of differences

After adoption of a final remedial action plan—

(1) if any remedial action is taken,

(2) if any enforcement action under section 9606 of this title is taken, or

(3) if any settlement or consent decree under section 9606 of this title or section 9622 of this title is entered into,


and if such action, settlement, or decree differs in any significant respects from the final plan, the President or the State shall publish an explanation of the significant differences and the reasons such changes were made.

(d) Publication

For the purposes of this section, publication shall include, at a minimum, publication in a major local newspaper of general circulation. In addition, each item developed, received, published, or made available to the public under this section shall be available for public inspection and copying at or near the facility at issue.

(e) Grants for technical assistance

(1) Authority

Subject to such amounts as are provided in appropriations Acts and in accordance with rules promulgated by the President, the President may make grants available to any group of individuals which may be affected by a release or threatened release at any facility which is listed on the National Priorities List under the National Contingency Plan. Such grants may be used to obtain technical assistance in interpreting information with regard to the nature of the hazard, remedial investigation and feasibility study, record of decision, remedial design, selection and construction of remedial action, operation and maintenance, or removal action at such facility.

(2) Amount

The amount of any grant under this subsection may not exceed $50,000 for a single grant recipient. The President may waive the $50,000 limitation in any case where such waiver is necessary to carry out the purposes of this subsection. Each grant recipient shall be required, as a condition of the grant, to contribute at least 20 percent of the total of costs of the technical assistance for which such grant is made. The President may waive the 20 percent contribution requirement if the grant recipient demonstrates financial need and such waiver is necessary to facilitate public participation in the selection of remedial action at the facility. Not more than one grant may be made under this subsection with respect to a single facility, but the grant may be renewed to facilitate public participation at all stages of remedial action.