(1) All projects located within the C-51 Basin which propose to discharge directly or indirectly into C-51 Canal or which are connected directly or indirectly in the C-51 Basin and which require permits pursuant to Fl. Admin. Code R. 62-330.020, or this part shall be constructed, altered, operated, maintained and abandoned in accordance with the criteria specified in Rules 62-330.301, 62-330.302 and 40E-41.263, F.A.C., unless specifically exempted by Fl. Admin. Code R. 40E-4.051

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

    (2) The criteria in Fl. Admin. Code R. 40E-41.263, shall apply unless the applicant can demonstrate through accepted scientific and technical methodology that the purpose and intent of this rule chapter is fulfilled by the use of alternate criteria.
    (3) All projects located within the C-51 Basin requiring permits pursuant to Rules 40E-6.041, F.A.C., (Works of the District, Consent Required), and Fl. Admin. Code R. 40E-6.331, (Works of the District, Modification of Permits), shall comply with the criteria set forth in Rules 40E-6.301, F.A.C., (Works of the District, Conditions for Issuance of Permits), and Fl. Admin. Code R. 40E-41.265, (Conditions for Issuance of Right-of-Way Permits in the C-51 Basin).
    (4) The criteria in Fl. Admin. Code R. 40E-41.265, (Conditions for Issuance of Right-of-Way Permits in the C-51 Basin), shall apply unless the applicant can demonstrate through accepted scientific and technical methodology that the purpose and intent of this rule chapter is fulfilled by the use of alternate criteria.
Rulemaking Authority 373.044, 373.113, 373.4131 FS. Law Implemented 373.085, 373.086, 373.413, 373.4131, 373.416 FS. History-New 5-15-87, Amended 4-20-94, 12-1-11, 10-1-13.