Illinois Compiled Statutes 415 ILCS 5/22.51 – Clean Construction or Demolition Debris Fill Operations
Current as of: 2024 | Check for updates
|
Other versions
(a) No person shall conduct any clean construction or demolition debris fill operation in violation of this Act or any regulations or standards adopted by the Board.
(b)(1)(A) Beginning August 18, 2005 but prior to July 1, 2008, no person shall use clean construction or demolition debris as fill material in a current or former quarry, mine, or other excavation, unless they have applied for an interim authorization from the Agency for the clean construction or demolition debris fill operation.
(B) The Agency shall approve an interim authorization upon its receipt of a written application for the interim authorization that is signed by the site owner and the site operator, or their duly authorized agent, and that contains the following information: (i) the location of the site where the clean construction or demolition debris fill operation is taking place, (ii) the name and address of the site owner, (iii) the name and address of the site operator, and (iv) the types and amounts of clean construction or demolition debris being used as fill material at the site.
(C) The Agency may deny an interim authorization if the site owner or the site operator, or their duly authorized agent, fails to provide to the Agency the information listed in subsection (b)(1)(B) of this Section. Any denial of an interim authorization shall be subject to appeal to the Board in accordance with the procedures of Section 40 of this Act.
(D) No person shall use clean construction or demolition debris as fill material in a current or former quarry, mine, or other excavation for which the Agency has denied interim authorization under subsection (b)(1)(C) of this Section. The Board may stay the prohibition of this subsection (D) during the pendency of an appeal of the Agency’s denial of the interim authorization brought under subsection (b)(1)(C) of this Section.
(2) Beginning September 1, 2006, owners and operators of clean construction or demolition debris fill operations shall, in accordance with a schedule prescribed by the Agency, submit to the Agency applications for the permits required under this Section. The Agency shall notify owners and operators in writing of the due date for their permit application. The due date shall be no less than 90 days after the date of the Agency’s written notification. Owners and operators who do not receive a written notification from the Agency by October 1, 2007, shall submit a permit application to the Agency by January 1, 2008. The interim authorization of owners and operators who fail to submit a permit application to the Agency by the permit application’s due date shall terminate on (i) the due date established by the Agency if the owner or operator received a written notification from the Agency prior to October 1, 2007, or (ii) or January 1, 2008, if the owner or operator did not receive a written notification from the Agency by October 1, 2007.
(3) On and after July 1, 2008, no person shall use clean construction or demolition debris as fill material in a current or former quarry, mine, or other excavation (i) without a permit granted by the Agency for the clean construction or demolition debris fill operation or in violation of any conditions imposed by such permit, including periodic reports and full access to adequate records and the inspection of facilities, as may be necessary to assure compliance with this Act and with Board regulations and standards adopted under this Act or (ii) in violation of any regulations or standards adopted by the Board under this Act.
(4) This subsection (b) does not apply to:
(A) the use of clean construction or demolition
(b)(1)(A) Beginning August 18, 2005 but prior to July 1, 2008, no person shall use clean construction or demolition debris as fill material in a current or former quarry, mine, or other excavation, unless they have applied for an interim authorization from the Agency for the clean construction or demolition debris fill operation.
Terms Used In Illinois Compiled Statutes 415 ILCS 5/22.51
- Appeal: A request made after a trial, asking another court (usually the court of appeals) to decide whether the trial was conducted properly. To make such a request is "to appeal" or "to take an appeal." One who appeals is called the appellant.
- Litigation: A case, controversy, or lawsuit. Participants (plaintiffs and defendants) in lawsuits are called litigants.
- Real property: Land, and all immovable fixtures erected on, growing on, or affixed to the land.
- Units of local government: has the meaning established in Section 1 of Article VII of the Constitution of the State of Illinois of 1970. See Illinois Compiled Statutes 5 ILCS 70/1.28
(B) The Agency shall approve an interim authorization upon its receipt of a written application for the interim authorization that is signed by the site owner and the site operator, or their duly authorized agent, and that contains the following information: (i) the location of the site where the clean construction or demolition debris fill operation is taking place, (ii) the name and address of the site owner, (iii) the name and address of the site operator, and (iv) the types and amounts of clean construction or demolition debris being used as fill material at the site.
(C) The Agency may deny an interim authorization if the site owner or the site operator, or their duly authorized agent, fails to provide to the Agency the information listed in subsection (b)(1)(B) of this Section. Any denial of an interim authorization shall be subject to appeal to the Board in accordance with the procedures of Section 40 of this Act.
(D) No person shall use clean construction or demolition debris as fill material in a current or former quarry, mine, or other excavation for which the Agency has denied interim authorization under subsection (b)(1)(C) of this Section. The Board may stay the prohibition of this subsection (D) during the pendency of an appeal of the Agency’s denial of the interim authorization brought under subsection (b)(1)(C) of this Section.
(2) Beginning September 1, 2006, owners and operators of clean construction or demolition debris fill operations shall, in accordance with a schedule prescribed by the Agency, submit to the Agency applications for the permits required under this Section. The Agency shall notify owners and operators in writing of the due date for their permit application. The due date shall be no less than 90 days after the date of the Agency’s written notification. Owners and operators who do not receive a written notification from the Agency by October 1, 2007, shall submit a permit application to the Agency by January 1, 2008. The interim authorization of owners and operators who fail to submit a permit application to the Agency by the permit application’s due date shall terminate on (i) the due date established by the Agency if the owner or operator received a written notification from the Agency prior to October 1, 2007, or (ii) or January 1, 2008, if the owner or operator did not receive a written notification from the Agency by October 1, 2007.
(3) On and after July 1, 2008, no person shall use clean construction or demolition debris as fill material in a current or former quarry, mine, or other excavation (i) without a permit granted by the Agency for the clean construction or demolition debris fill operation or in violation of any conditions imposed by such permit, including periodic reports and full access to adequate records and the inspection of facilities, as may be necessary to assure compliance with this Act and with Board regulations and standards adopted under this Act or (ii) in violation of any regulations or standards adopted by the Board under this Act.
(4) This subsection (b) does not apply to:
(A) the use of clean construction or demolition
debris as fill material in a current or former quarry, mine, or other excavation located on the site where the clean construction or demolition debris was generated;
|
(B) the use of clean construction or demolition
debris as fill material in an excavation other than a current or former quarry or mine if this use complies with Illinois Department of Transportation specifications; or
|
(C) current or former quarries, mines, and other
excavations that do not use clean construction or demolition debris as fill material.
|
(c) In accordance with Title VII of this Act, the Board may adopt regulations to promote the purposes of this Section. The Agency shall consult with the mining and construction industries during the development of any regulations to promote the purposes of this Section.
(1) No later than December 15, 2005, the Agency shall
(1) No later than December 15, 2005, the Agency shall
propose to the Board, and no later than September 1, 2006, the Board shall adopt, regulations for the use of clean construction or demolition debris as fill material in current and former quarries, mines, and other excavations. Such regulations shall include, but shall not be limited to, standards for clean construction or demolition debris fill operations and the submission and review of permits required under this Section.
|
(2) Until the Board adopts rules under subsection
(c)(1) of this Section, all persons using clean construction or demolition debris as fill material in a current or former quarry, mine, or other excavation shall:
|
(A) Assure that only clean construction or
demolition debris is being used as fill material by screening each truckload of material received using a device approved by the Agency that detects volatile organic compounds. Such devices may include, but are not limited to, photo ionization detectors. All screening devices shall be operated and maintained in accordance with manufacturer’s specifications. Unacceptable fill material shall be rejected from the site; and
|
(B) Retain for a minimum of 3 years the following
information:
|
(i) The name of the hauler, the name of the
generator, and place of origin of the debris or soil;
|
(ii) The approximate weight or volume of the
debris or soil; and
|
(iii) The date the debris or soil was
received.
|
(d) This Section applies only to clean construction or demolition debris that is not considered “waste” as provided in Section 3.160 of this Act.
(e) For purposes of this Section:
(1) The term “operator” means a person responsible
(e) For purposes of this Section:
(1) The term “operator” means a person responsible
for the operation and maintenance of a clean construction or demolition debris fill operation.
|
(2) The term “owner” means a person who has any
direct or indirect interest in a clean construction or demolition debris fill operation or in land on which a person operates and maintains a clean construction or demolition debris fill operation. A “direct or indirect interest” does not include the ownership of publicly traded stock. The “owner” is the “operator” if there is no other person who is operating and maintaining a clean construction or demolition debris fill operation.
|
(3) The term “clean construction or demolition debris
fill operation” means a current or former quarry, mine, or other excavation where clean construction or demolition debris is used as fill material.
|
(4) The term “uncontaminated soil” shall have the
same meaning as uncontaminated soil under Section 3.160 of this Act.
|
(f)(1) No later than one year after the effective date of this amendatory Act of the 96th General Assembly, the Agency shall propose to the Board, and, no later than one year after the Board’s receipt of the Agency’s proposal, the Board shall adopt, rules for the use of clean construction or demolition debris and uncontaminated soil as fill material at clean construction or demolition debris fill operations. The rules must include standards and procedures necessary to protect groundwater, which may include, but shall not be limited to, the following: requirements regarding testing and certification of soil used as fill material, surface water runoff, liners or other protective barriers, monitoring (including, but not limited to, groundwater monitoring), corrective action, recordkeeping, reporting, closure and post-closure care, financial assurance, post-closure land use controls, location standards, and the modification of existing permits to conform to the requirements of this Act and Board rules. The rules may also include limits on the use of recyclable concrete and asphalt as fill material at clean construction or demolition debris fill operations, taking into account factors such as technical feasibility, economic reasonableness, and the availability of markets for such materials.
(2) Until the effective date of the Board rules adopted under subdivision (f)(1) of this Section, and in addition to any other requirements, owners and operators of clean construction or demolition debris fill operations must do all of the following in subdivisions (f)(2)(A) through (f)(2)(D) of this Section for all clean construction or demolition debris and uncontaminated soil accepted for use as fill material. The requirements in subdivisions (f)(2)(A) through (f)(2)(D) of this Section shall not limit any rules adopted by the Board.
(A) Document the following information for each load
(2) Until the effective date of the Board rules adopted under subdivision (f)(1) of this Section, and in addition to any other requirements, owners and operators of clean construction or demolition debris fill operations must do all of the following in subdivisions (f)(2)(A) through (f)(2)(D) of this Section for all clean construction or demolition debris and uncontaminated soil accepted for use as fill material. The requirements in subdivisions (f)(2)(A) through (f)(2)(D) of this Section shall not limit any rules adopted by the Board.
(A) Document the following information for each load
of clean construction or demolition debris or uncontaminated soil received: (i) the name of the hauler, the address of the site of origin, and the owner and the operator of the site of origin of the clean construction or demolition debris or uncontaminated soil, (ii) the weight or volume of the clean construction or demolition debris or uncontaminated soil, and (iii) the date the clean construction or demolition debris or uncontaminated soil was received.
|
(B) For all soil, obtain either (i) a certification
from the owner or operator of the site from which the soil was removed that the site has never been used for commercial or industrial purposes and is presumed to be uncontaminated soil or (ii) a certification from a licensed Professional Engineer or licensed Professional Geologist that the soil is uncontaminated soil. Certifications required under this subdivision (f)(2)(B) must be on forms and in a format prescribed by the Agency.
|
(C) Confirm that the clean construction or demolition
debris or uncontaminated soil was not removed from a site as part of a cleanup or removal of contaminants, including, but not limited to, activities conducted under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980, as amended; as part of a Closure or Corrective Action under the Resource Conservation and Recovery Act, as amended; or under an Agency remediation program, such as the Leaking Underground Storage Tank Program or Site Remediation Program, but excluding sites subject to Section 58.16 of this Act where there is no presence or likely presence of a release or a substantial threat of a release of a regulated substance at, on, or from the real property.
|
(D) Document all activities required under
subdivision (f)(2) of this Section. Documentation of any chemical analysis must include, but is not limited to, (i) a copy of the lab analysis, (ii) accreditation status of the laboratory performing the analysis, and (iii) certification by an authorized agent of the laboratory that the analysis has been performed in accordance with the Agency’s rules for the accreditation of environmental laboratories and the scope of accreditation.
|
(3) Owners and operators of clean construction or demolition debris fill operations must maintain all documentation required under subdivision (f)(2) of this Section for a minimum of 3 years following the receipt of each load of clean construction or demolition debris or uncontaminated soil, except that documentation relating to an appeal, litigation, or other disputed claim must be maintained until at least 3 years after the date of the final disposition of the appeal, litigation, or other disputed claim. Copies of the documentation must be made available to the Agency and to units of local government for inspection and copying during normal business hours. The Agency may prescribe forms and formats for the documentation required under subdivision (f)(2) of this Section.
Chemical analysis conducted under subdivision (f)(2) of this Section must be conducted in accordance with the requirements of 35 Ill. Adm. Code 742, as amended, and “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods”, USEPA Publication No. SW-846, as amended.
(g)(1) No person shall use soil other than uncontaminated soil as fill material at a clean construction or demolition debris fill operation.
(2) No person shall use construction or demolition debris other than clean construction or demolition debris as fill material at a clean construction or demolition debris fill operation.
Chemical analysis conducted under subdivision (f)(2) of this Section must be conducted in accordance with the requirements of 35 Ill. Adm. Code 742, as amended, and “Test Methods for Evaluating Solid Waste, Physical/Chemical Methods”, USEPA Publication No. SW-846, as amended.
(g)(1) No person shall use soil other than uncontaminated soil as fill material at a clean construction or demolition debris fill operation.
(2) No person shall use construction or demolition debris other than clean construction or demolition debris as fill material at a clean construction or demolition debris fill operation.