Kentucky Statutes 278.466 – Availability of net metering — Type, expense, and installation of meter — Compensation to eligible customer-generators for electricity fed back into grid — Commission to set compensation rate — Excess generation credit…
Current as of: 2024 | Check for updates
|
Other versions
(1) Each retail electric supplier shall make net metering available to any eligible customer-generator that the supplier currently serves or solicits for service. If the cumulative generating capacity of net metering systems reaches one percent (1%) of a supplier’s single hour peak load during a calendar year, the supplier shall have no further obligation to offer net metering to any new customer-generator at any subsequent time.
(2) Each retail electric supplier serving a customer with eligible electric generating facilities shall use a standard kilowatt-hour meter capable of registering the flow of electricity in two (2) directions. Any additional meter, meters, or distribution upgrades needed to monitor the flow in each direction shall be installed at the customer-generator’s expense. If additional meters are installed, the net metering calculation shall yield the same result as when a single meter is used.
(3) A retail electric supplier serving an eligible customer-generator shall compensate that customer for all electricity produced by the customer’s eligible electric generating facility that flows to the retail electric supplier, as measured by the standard kilowatt-hour metering prescribed in subsection (2) of this section. The rate to be used for such compensation shall be set by the commission using the ratemaking processes under this chapter during a proceeding initiated by a retail electric supplier or generation and transmission cooperative on behalf of one (1) or more retail electric suppliers.
(4) Each billing period, compensation provided to an eligible customer-generator shall be in the form of a dollar-denominated bill credit. If an eligible customer-generator’s bill credit exceeds the amount to be billed to the customer in a billing period, the amount of the credit in excess of the customer’s bill shall carry forward to the customer’s next bill. Excess bill credits shall not be transferable between customers or premises. If an eligible customer-generator closes his or her account, no cash refund for accumulated credits shall be paid.
(5) Using the ratemaking process provided by this chapter, each retail electric supplier shall be entitled to implement rates to recover from its eligible customer-generators all costs necessary to serve its eligible customer-generators, including but not limited to fixed and demand-based costs, without regard for the rate structure for customers who are not eligible customer-generators.
(6) For an eligible electric generating facility in service prior to the effective date of the initial net metering order by the commission in accordance with subsection (3) of this section, the net metering tariff provisions in place when the eligible customer- generator began taking net metering service, including the one-to-one (1:1) kilowatt-hour denominated energy credit provided for electricity fed into the grid, shall remain in effect at those premises for a twenty-five (25) year period, regardless
of whether the premises are sold or conveyed during that twenty-five (25) year period. For any eligible customer-generator to whom this subsection applies, each net metering contract or tariff under which the customer takes service shall be identical, with respect to energy rates, rate structure, and monthly charges, to the contract or tariff to which the same customer would be assigned if the customer were not an eligible customer-generator.
(7) Electric generating systems and interconnecting equipment used by eligible customer-generators shall meet all applicable safety and power quality standards established by the National Electrical Code (NEC), Institute of Electrical and Electronics Engineers (IEEE), and accredited testing laboratories such as Underwriters Laboratories.
(8) An eligible customer-generator installation is transferable to other persons at the same premises upon notification to the retail electric supplier and verification that the installation is in compliance with the applicable safety and power quality standards in KRS § 278.467 and in subsection (7) of this section.
(9) Any upgrade of the interconnection between the retail electric supplier and the customer-generator that is required by commission-approved tariffs for the purpose of allowing net metering shall be made at the expense of the customer-generator.
Effective: January 1, 2020
History: Amended 2019 Ky. Acts ch. 101, sec. 2, effective January 1, 2020. — Amended 2008 Ky. Acts ch. 138, sec. 2, effective July 15, 2008. — Created 2004 Ky. Acts ch. 193, sec. 2, effective July 13, 2004.
(2) Each retail electric supplier serving a customer with eligible electric generating facilities shall use a standard kilowatt-hour meter capable of registering the flow of electricity in two (2) directions. Any additional meter, meters, or distribution upgrades needed to monitor the flow in each direction shall be installed at the customer-generator’s expense. If additional meters are installed, the net metering calculation shall yield the same result as when a single meter is used.
Terms Used In Kentucky Statutes 278.466
- Contract: A legal written agreement that becomes binding when signed.
- Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.
- Year: means calendar year. See Kentucky Statutes 446.010
(3) A retail electric supplier serving an eligible customer-generator shall compensate that customer for all electricity produced by the customer’s eligible electric generating facility that flows to the retail electric supplier, as measured by the standard kilowatt-hour metering prescribed in subsection (2) of this section. The rate to be used for such compensation shall be set by the commission using the ratemaking processes under this chapter during a proceeding initiated by a retail electric supplier or generation and transmission cooperative on behalf of one (1) or more retail electric suppliers.
(4) Each billing period, compensation provided to an eligible customer-generator shall be in the form of a dollar-denominated bill credit. If an eligible customer-generator’s bill credit exceeds the amount to be billed to the customer in a billing period, the amount of the credit in excess of the customer’s bill shall carry forward to the customer’s next bill. Excess bill credits shall not be transferable between customers or premises. If an eligible customer-generator closes his or her account, no cash refund for accumulated credits shall be paid.
(5) Using the ratemaking process provided by this chapter, each retail electric supplier shall be entitled to implement rates to recover from its eligible customer-generators all costs necessary to serve its eligible customer-generators, including but not limited to fixed and demand-based costs, without regard for the rate structure for customers who are not eligible customer-generators.
(6) For an eligible electric generating facility in service prior to the effective date of the initial net metering order by the commission in accordance with subsection (3) of this section, the net metering tariff provisions in place when the eligible customer- generator began taking net metering service, including the one-to-one (1:1) kilowatt-hour denominated energy credit provided for electricity fed into the grid, shall remain in effect at those premises for a twenty-five (25) year period, regardless
of whether the premises are sold or conveyed during that twenty-five (25) year period. For any eligible customer-generator to whom this subsection applies, each net metering contract or tariff under which the customer takes service shall be identical, with respect to energy rates, rate structure, and monthly charges, to the contract or tariff to which the same customer would be assigned if the customer were not an eligible customer-generator.
(7) Electric generating systems and interconnecting equipment used by eligible customer-generators shall meet all applicable safety and power quality standards established by the National Electrical Code (NEC), Institute of Electrical and Electronics Engineers (IEEE), and accredited testing laboratories such as Underwriters Laboratories.
(8) An eligible customer-generator installation is transferable to other persons at the same premises upon notification to the retail electric supplier and verification that the installation is in compliance with the applicable safety and power quality standards in KRS § 278.467 and in subsection (7) of this section.
(9) Any upgrade of the interconnection between the retail electric supplier and the customer-generator that is required by commission-approved tariffs for the purpose of allowing net metering shall be made at the expense of the customer-generator.
Effective: January 1, 2020
History: Amended 2019 Ky. Acts ch. 101, sec. 2, effective January 1, 2020. — Amended 2008 Ky. Acts ch. 138, sec. 2, effective July 15, 2008. — Created 2004 Ky. Acts ch. 193, sec. 2, effective July 13, 2004.