Texas Utilities Code 35.007 – Tariffs Required
Current as of: 2024 | Check for updates
|
Other versions
(a) Except as provided by Subsection (b), an electric utility that owns or operates a transmission facility shall file a tariff in compliance with commission rules adopted under § 35.006.
(b) An electric utility is not required to file a tariff under this section if the utility’s terms for access and pricing for wholesale transmission service are included in another electric utility’s tariff.
Terms Used In Texas Utilities Code 35.007
- Jurisdiction: (1) The legal authority of a court to hear and decide a case. Concurrent jurisdiction exists when two courts have simultaneous responsibility for the same case. (2) The geographic area over which the court has authority to decide cases.
(c) An electric utility shall file a tariff required by this section with the appropriate state or federal regulatory agency having jurisdiction over the utility’s transmission service.