Texas Utilities Code 39.167 – Reliability Plan for Permian Basin
(a) Not later than January 30, 2024, the commission shall direct the independent organization certified under § 39.151 for the ERCOT power region to develop a reliability plan under § 39.166 for the Permian Basin region.
(b) The plan must:
(1) address extending transmission service to areas where mineral resources have been found;
(2) address increasing available capacity to meet forecasted load; and
(3) provide available infrastructure to reduce interconnection times in areas without access to transmission service.
(c) This section expires September 1, 2025.
Text of section as added by Acts 2023, 88th Leg., R.S., Ch. 892 (H.B. 5066), Sec. 3
For text of section as added by Acts 2023, 88th Leg., R.S., Ch. 410 (H.B. 1500), Sec. 24(b), see other Sec. 39.167.
For expiration of this section, see Subsection (c).
<