(a) The joint review team is authorized to waive application of any state or local statutes, regulations, or requirements enacted or promulgated after the commencement of construction of a major energy project, unless the general assembly explicitly prohibits such waiver. No waiver pursuant to this section shall take effect unless:

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Tennessee Code 13-18-118

  • Litigation: A case, controversy, or lawsuit. Participants (plaintiffs and defendants) in lawsuits are called litigants.
  • Major energy project: means any project at one (1) physical location which has been determined by the contact agency to be in the state interest pursuant to its authority under §. See Tennessee Code 13-18-102
  • State: when applied to the different parts of the United States, includes the District of Columbia and the several territories of the United States. See Tennessee Code 1-3-105
  • Statute: A law passed by a legislature.
  • team: means a coordinating group organized to conduct the joint review process on a major energy project. See Tennessee Code 13-18-102
(1) The team finds that the waiver is necessary to ensure timely and cost-effective completion and operation of the facility; and
(2) The team, after consultation with the agency responsible for implementing the statute, regulation, or requirement to be waived, finds that the waiver will not unduly endanger public health or safety.
(b)

(1) For the purposes of this section, “commencement of construction” means that the owner or operator of a major energy project has obtained all necessary preconstruction approvals or permits required by state or local laws or regulations and either has:

(A) Begun or caused to begin, a continuous program of physical on-site construction of the facility, including site clearance, grading, dredging, or land filling in preparation for the fabrication, erection, or installation of the building components of the facility; or
(B) Entered into binding agreements or contractual obligations, which cannot be cancelled or modified without substantial loss to the owner or operator, to undertake a program of construction of the facility to be completed within a reasonable time.
(2) For the purpose of this subsection (b), interruptions resulting from acts of God, strikes, litigation, or other matters beyond the control of the owner shall be disregarded in determining whether such construction is continuous.