Terms Used In Iowa Code 572.14

  • Contract: A legal written agreement that becomes binding when signed.
  • Lien: A claim against real or personal property in satisfaction of a debt.
572.14 Liability to subcontractor after payment to general contractor or owner-builder.
Except as provided in § 572.13B, payment to the general contractor or owner-builder
of any part or all of the contract price of the building or improvement within ninety days after the date on which the last of the materials was furnished or the last of the labor was performed by a subcontractor, does not relieve the owner from liability to the subcontractor for the full value of any material furnished or labor performed upon the building, land, or improvement if the subcontractor posts a lien within ninety days after the date on which the last of the materials was furnished or the last of the labor was performed.
[S13, §3093; C24, 27, 31, 35, 39, §10283; C46, 50, 54, 58, 62, 66, 71, 73, 75, 77, 79, 81,
§572.14; 81 Acts, ch 186, §2]
87 Acts, ch 79, §6; 98 Acts, ch 1142, §3; 2007 Acts, ch 83, §10; 2012 Acts, ch 1105, §11, 27,