Connecticut General Statutes 16-50cc – Reconfiguration or burial of electric transmission facility
Current as of: 2024 | Check for updates
|
Other versions
If legislation adopted on or after January 1, 2004, results in the reconfiguration or burial of a proposed facility described in subdivision (1) of subsection (a) of section 16-50i, all prudent costs incurred by an electric distribution company, as defined in section 16-1, associated with the reconfiguration or burial shall be deemed to be reasonable pursuant to sections 16-19 and 16-19e and shall be recovered by the electric distribution company in its rates.
Terms Used In Connecticut General Statutes 16-50cc
- distribution company: means any person providing electric transmission or distribution services within the state, but does not include: (A) A private power producer, as defined in section 16-243b. See Connecticut General Statutes 16-1
- Facility: means : (1) An electric transmission line of a design capacity of sixty-nine kilovolts or more, including associated equipment but not including a transmission line tap, as defined in subsection (e) of this section. See Connecticut General Statutes 16-50i