Utah Code > Title 73 > Chapter 28 – Lake Powell Pipeline Development Act
Current as of: 2024 | Check for updates
|
Other versions
Terms Used In Utah Code > Title 73 > Chapter 28 - Lake Powell Pipeline Development Act
- Award: means a final order of the commission as to the amount of compensation due:(1)(b)(i) an injured employee; or(1)(b)(ii) a dependent of a deceased employee. See Utah Code 34A-2-102
- Board: means the Board of Water Resources. See Utah Code 73-28-103
- City: includes , depending on population, a metro township as defined in Section
10-3c-102 . See Utah Code 68-3-12.5- Commission: means the Labor Commission created in Section 34A-1-103. See Utah Code 34A-1-102
- Committee: means the Project Management Committee created in Section
73-28-105 . See Utah Code 73-28-103- Compensation: means the payments and benefits provided for in this chapter or Chapter 3, Utah Occupational Disease Act. See Utah Code 34A-2-102
- Construction costs: means all costs related to the construction of the project, including the environmental mitigation costs. See Utah Code 73-28-103
- Contract: A legal written agreement that becomes binding when signed.
- Decision: includes :
(1)(d)(ii)(A) an award or denial of a medical, disability, death, or other related benefit under this chapter or Chapter 3, Utah Occupational Disease Act; or(1)(d)(ii)(B) another adjudicative ruling in accordance with this chapter or Chapter 3, Utah Occupational Disease Act. See Utah Code 34A-2-102- Developed water: means surface water developed by the project. See Utah Code 73-28-103
- Director: means the director of the division, unless the context requires otherwise. See Utah Code 34A-2-102
- Disability: means an administrative determination that may result in an entitlement to compensation as a consequence of becoming medically impaired as to function. See Utah Code 34A-2-102
- District: means :
(5)(a) the Central Iron County Water Conservancy District;(5)(b) the Kane County Water Conservancy District;(5)(c) the Washington County Water Conservancy District; or(5)(d) any combination of those districts listed in Subsections(5)(a) through(c) . See Utah Code 73-28-103- Division: means the Division of Industrial Accidents. See Utah Code 34A-2-102
- Division: means the Division of Water Resources. See Utah Code 73-28-103
- Environmental mitigation costs: means costs associated with obtaining permits required by federal, state, or local governmental agencies. See Utah Code 73-28-103
- Evidence: Information presented in testimony or in documents that is used to persuade the fact finder (judge or jury) to decide the case for one side or the other.
- Indemnification: In general, a collateral contract or assurance under which one person agrees to secure another person against either anticipated financial losses or potential adverse legal consequences. Source: FDIC
- Interest rate: The amount paid by a borrower to a lender in exchange for the use of the lender's money for a certain period of time. Interest is paid on loans or on debt instruments, such as notes or bonds, either at regular intervals or as part of a lump sum payment when the issue matures. Source: OCC
- Land: includes :
(18)(a) land;(18)(b) a tenement;(18)(c) a hereditament;(18)(d) a water right;(18)(e) a possessory right; and(18)(f) a claim. See Utah Code 68-3-12.5- Order: means an action of the commission that determines the legal rights, duties, privileges, immunities, or other interests of one or more specific persons, but not a class of persons. See Utah Code 34A-2-102
- Person: means :
(24)(a) an individual;(24)(b) an association;(24)(c) an institution;(24)(d) a corporation;(24)(e) a company;(24)(f) a trust;(24)(g) a limited liability company;(24)(h) a partnership;(24)(i) a political subdivision;(24)(j) a government office, department, division, bureau, or other body of government; and(24)(k) any other organization or entity. See Utah Code 68-3-12.5- Preconstruction costs: means any of the following costs incurred before project construction begins:
(8)(a) planning;(8)(b) design;(8)(c) engineering studies;(8)(d) legal work;(8)(e) permitting;(8)(f) acquisition of land and rights-of-way;(8)(g) compensation for impairment of existing water rights;(8)(h) environmental studies; or(8)(i) any combination of Subsections(8)(a) through(h) . See Utah Code 73-28-103- Project: means the Lake Powell Pipeline project and associated facilities, including:
(9)(a)(i) facilities associated with environmental mitigation;(9)(a)(ii) hydroelectric generating works and incidental electrical facilities;(9)(a)(iii) pipelines; and(9)(a)(iv) pumping stations. See Utah Code 73-28-103- Project costs: include preconstruction costs, construction costs, and project operation, maintenance, repair, and replacement costs. See Utah Code 73-28-103
- Quorum: The number of legislators that must be present to do business.
- State: when applied to the different parts of the United States, includes a state, district, or territory of the United States. See Utah Code 68-3-12.5
- Statute: A law passed by a legislature.
- Testimony: Evidence presented orally by witnesses during trials or before grand juries.
- United States: includes each state, district, and territory of the United States of America. See Utah Code 68-3-12.5
- Writing: includes :
(48)(a) printing;(48)(b) handwriting; and(48)(c) information stored in an electronic or other medium if the information is retrievable in a perceivable format. See Utah Code 68-3-12.5