Utah Code > Title 73 > Chapter 26 > Part 1 – State to Develop the Bear River
Current as of: 2024 | Check for updates
|
Other versions
Terms Used In Utah Code > Title 73 > Chapter 26 > Part 1 - State to Develop the Bear River
- Board: means the Board of Water Resources. See Utah Code 73-26-103
- Construction costs: means all costs related to the development of a project, except the costs of environmental mitigation. See Utah Code 73-26-103
- Developed waters: means surface water developed by projects authorized under this chapter. See Utah Code 73-26-103
- Division: means the Division of Water Resources. See Utah Code 73-26-103
- Environmental mitigation costs: means costs that may be required by federal, state, or local governmental agencies for project environmental permitting, including:(5)(a) planning;(5)(b) environmental and engineering studies;(5)(c) permitting;(5)(d) acquisition of land and rights-of-way; and(5)(e) operation, maintenance, and repair of facilities associated with project environmental mitigation. See Utah Code 73-26-103
- Equitable: Pertaining to civil suits in "equity" rather than in "law." In English legal history, the courts of "law" could order the payment of damages and could afford no other remedy. See damages. A separate court of "equity" could order someone to do something or to cease to do something. See, e.g., injunction. In American jurisprudence, the federal courts have both legal and equitable power, but the distinction is still an important one. For example, a trial by jury is normally available in "law" cases but not in "equity" cases. Source: U.S. Courts
- Land: includes :
(18)(a) land;(18)(b) a tenement;(18)(c) a hereditament;(18)(d) a water right;(18)(e) a possessory right; and(18)(f) a claim. See Utah Code 68-3-12.5- Person: means :
(24)(a) an individual;(24)(b) an association;(24)(c) an institution;(24)(d) a corporation;(24)(e) a company;(24)(f) a trust;(24)(g) a limited liability company;(24)(h) a partnership;(24)(i) a political subdivision;(24)(j) a government office, department, division, bureau, or other body of government; and(24)(k) any other organization or entity. See Utah Code 68-3-12.5- Preconstruction costs: means any of the following costs incurred before project construction begins:
(6)(a) planning;(6)(b) design;(6)(c) engineering studies;(6)(d) legal work;(6)(e) permitting;(6)(f) acquisition of land and rights-of-way;(6)(g) compensation for impairment of existing water rights;(6)(h) environmental studies; or(6)(i) any combination of Subsections(6)(a) through(h) . See Utah Code 73-26-103- Project costs: include preconstruction costs, construction costs, environmental mitigation costs, and costs of operation, maintenance, repair, and replacement. See Utah Code 73-26-103
- State: when applied to the different parts of the United States, includes a state, district, or territory of the United States. See Utah Code 68-3-12.5