Utah Code > Title 73 > Chapter 26 > Part 3 – Project Development
Current as of: 2024 | Check for updates
|
Other versions
§ 73-26-301 | Projects authorized |
§ 73-26-302 | Construction contingent upon sale or lease of water — Preconstruction may proceed if funded |
Terms Used In Utah Code > Title 73 > Chapter 26 > Part 3 - Project Development
- Construction costs: means all costs related to the development of a project, except the costs of environmental mitigation. See Utah Code 73-26-103
- Division: means the Division of Water Resources. See Utah Code 73-26-103
- Lease: A contract transferring the use of property or occupancy of land, space, structures, or equipment in consideration of a payment (e.g., rent). Source: OCC
- Preconstruction costs: means any of the following costs incurred before project construction begins:(6)(a) planning;(6)(b) design;(6)(c) engineering studies;(6)(d) legal work;(6)(e) permitting;(6)(f) acquisition of land and rights-of-way;(6)(g) compensation for impairment of existing water rights;(6)(h) environmental studies; or(6)(i) any combination of Subsections
(6)(a) through(h) . See Utah Code 73-26-103- Statute: A law passed by a legislature.