Utah Code 73-5a-402. Standard operating plans required
Current as of: 2024 | Check for updates
|
Other versions
Terms Used In Utah Code 73-5a-402
- State: when applied to the different parts of the United States, includes a state, district, or territory of the United States. See Utah Code 68-3-12.5
The owner of each dam shall prepare a standard operating plan for the dam. In the case of a dam in operation prior to May 1, 1991, the standard operating plan shall be submitted to the state engineer for his approval by May 1, 1994. In the case of any dam beginning operations on or after May 1, 1991, the standard operating plan shall be submitted to the state engineer for his approval prior to the final inspection.