(1) The board shall:

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Utah Code 73-28-201

  • Board: means the Board of Water Resources. See Utah Code 73-28-103
  • Committee: means the Project Management Committee created in Section 73-28-105. See Utah Code 73-28-103
  • Contract: A legal written agreement that becomes binding when signed.
  • Project: means the Lake Powell Pipeline project and associated facilities, including:
              (9)(a)(i) facilities associated with environmental mitigation;
              (9)(a)(ii) hydroelectric generating works and incidental electrical facilities;
              (9)(a)(iii) pipelines; and
              (9)(a)(iv) pumping stations. See Utah Code 73-28-103
  • Project costs: include preconstruction costs, construction costs, and project operation, maintenance, repair, and replacement costs. See Utah Code 73-28-103
  • State: when applied to the different parts of the United States, includes a state, district, or territory of the United States. See Utah Code 68-3-12.5
     (1)(a) construct the project as funded by the Legislature;
     (1)(b) own, operate, and maintain the project until the title is transferred under Section 73-28-405; and
     (1)(c) consult with the committee on a regular basis concerning the development, construction, operation, maintenance, repair, and replacement of the project.
(2)

     (2)(a) The board may contract with the state of Arizona to participate in the project to develop its water rights.
     (2)(b) The board shall ensure that the contract requires the state of Arizona to pay for all project costs represented by its share of the project.