Indiana Code 4-3-23.1-10. “Wind power project”
Current as of: 2024 | Check for updates
|
Other versions
Terms Used In Indiana Code 4-3-23.1-10
- project: refers to :
Indiana Code 4-3-23.1-7
- unit: means a county or a municipality, as specified in:
Indiana Code 4-3-23.1-9
Sec. 10. As used in this chapter, “wind power project” means a project involving the construction, installation, siting, modification, operation, or decommissioning of one (1) or more wind power devices (as defined in IC 8-1-41-7) in a unit.
As added by P.L.50-2023, SEC.1.