Indiana Code 8-1-39-2. “Eligible transmission, distribution, and storage system improvements”
(1) a public utility undertakes for purposes of safety, reliability, system modernization, or economic development, including the extension of gas service to rural areas;
Terms Used In Indiana Code 8-1-39-2
- commission: refers to the Indiana utility regulatory commission. See Indiana Code 8-1-1-1
- public utility: means :
Indiana Code 8-1-39-4
- targeted economic development project: means a project approved by the commission under section 10(c) of this chapter. See Indiana Code 8-1-39-5
- TDSIC: refers to a transmission, distribution, and storage system improvement charge. See Indiana Code 8-1-39-6
(3) either were:
(A) described in the public utility’s TDSIC plan and approved by the commission under section 10 of this chapter and authorized for TDSIC treatment;
(B) described in the public utility’s update to the public utility’s TDSIC plan under section 9 of this chapter and authorized for TDSIC treatment by the commission; or
(C) approved as a targeted economic development project under section 11 of this chapter.
(b) The term includes:
(1) projects that do not include specific locations or an exact number of inspections, repairs, or replacements, including inspection based projects such as pole or pipe inspection projects, and pole or pipe replacement projects; and
(2) projects involving advanced technology investments to support the modernization of a transmission, distribution, or storage system, such as advanced metering infrastructure, information technology systems, or distributed energy resource management systems.
As added by P.L.133-2013, SEC.5. Amended by P.L.89-2019, SEC.1.