Indiana Code 8-1-39-7.8. “TDSIC plan”
Current as of: 2024 | Check for updates
|
Other versions
Sec. 7.8. As used in this chapter, “TDSIC plan”, or plan, means a public utility‘s plan for eligible transmission, distribution, and storage system improvements over the course of a period of:
(2) not more than seven (7) years.
(1) at least five (5) years; and
Terms Used In Indiana Code 8-1-39-7.8
- public utility: means :
Indiana Code 8-1-39-4
As added by P.L.89-2019, SEC.2.