Indiana Code 10-18-4-8. Changes to designs, plans, and specifications
Current as of: 2024 | Check for updates
|
Other versions
Sec. 8. (a) Subject to subsections (b) and (c), any changes made in the designs, plans, and specifications in the progress of the work:
(2) must have the cost of the changes fixed by contract in writing.
(1) must be agreed upon in advance between the board of public works and the contractor and architect; and
Terms Used In Indiana Code 10-18-4-8
- board of public works: refers to the following:
Indiana Code 10-18-4-1
- Contract: A legal written agreement that becomes binding when signed.
- in writing: include printing, lithographing, or other mode of representing words and letters. See Indiana Code 1-1-4-5
- Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.
If changes made do not comply with subdivisions (1) and (2), the person making the changes is not entitled to any compensation for the changes.
(b) A change may not be made that will increase the total cost of the World War memorial as prescribed in this chapter.
(c) Any changes do not affect the obligation of or release any surety on any contract or bond executed or given in connection with the building of the World War memorial structures, but the liability of the surety is extended so as to cover the change.
[Pre-2003 Recodification Citation: 10-7-6-7.]
As added by P.L.2-2003, SEC.9.