Indiana Code 13-18-27-3. “Construction plan”
Current as of: 2024 | Check for updates
|
Other versions
Sec. 3. As used in this chapter, “construction plan” means a written plan that:
(2) includes a storm water pollution prevention plan that outlines how erosion and sedimentation will be controlled on the site of the construction project; and
(1) presents information about a construction project and activities associated with the construction project;
Terms Used In Indiana Code 13-18-27-3
- erosion: means the detachment and movement of soil, sediment, or rock fragments by water, wind, ice, or gravity. See Indiana Code 13-18-27-4
- general permit: refers to the general permit issued by the commissioner or the department in accordance with Indiana Code 13-18-27-6
- review authority: means either of the following:
Indiana Code 13-18-27-10
- sedimentation: means the settling and accumulation of unconsolidated sediment carried by storm water runoff. See Indiana Code 13-18-27-11
(3) must be submitted to a review authority as a condition of proceeding with the construction project under the general permit rule program established under 327 IAC 15-5 or the general permit.
As added by P.L.248-2019, SEC.14.