Sec. 22. This chapter does not require a change in the plans, construction, or designated use of a building for which a building permit was issued before the river commission was established if the following conditions are met:

(1) Construction is begun not later than ninety (90) days of the date of the permit.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Indiana Code 14-29-7-22

  • river: means that part of a body of flowing water and adjacent land that is the subject of a river commission established under this chapter. See Indiana Code 14-29-7-2
(2) The building is completed according to the plans not later than two (2) years from the date the river commission was established.

[Pre-1995 Recodification Citation: 13-2-27-22.]

As added by P.L.1-1995, SEC.22.