40 CFR 265.345 – General operating requirements
Current as of: 2024 | Check for updates
|
Other versions
During start-up and shut-down of an incinerator, the owner or operator must not feed hazardous waste unless the incinerator is at steady state (normal) conditions of operation, including steady state operating temperature and air flow.