49 CFR 234.9 – Grade crossing signal system failure reports
Current as of: 2024 | Check for updates
|
Other versions
Each railroad shall report to FRA within 15 days each activation failure of a highway-rail grade crossing warning system. FRA Form No. 6180-83, “Highway-Rail Grade Crossing Warning System Failure Report,” shall be used for this purpose and completed in accordance with instructions printed on the form.