14 USC 1171 – Definitions
In this chapter:
(1)
(2)
(3)
(4)
(A) an acquisition by the Coast Guard—
(i) the estimated life-cycle costs of which exceed $1,000,000,000; or
(ii) the estimated total acquisition costs of which exceed $300,000,000; or
(B) any acquisition that the Chief Acquisition Officer of the Coast Guard determines to have a special interest—
(i) due to—
(I) the experimental or technically immature nature of the asset;
(II) the technological complexity of the asset;
(III) the commitment of resources; or
(IV) the nature of the capability or set of capabilities to be achieved; or
(ii) because such acquisition is a joint acquisition.
(5)
(A) the estimated life-cycle costs of which are equal to or less than $1,000,000,000, but greater than $300,000,000; or
(B) the estimated total acquisition costs of which are equal to or less than $300,000,000, but greater than $100,000,000.
(6)
(7)
(8)
(A) to develop, produce, and deploy a new asset to meet identified operational requirements; and
(B) to manage cost, schedule, and performance of the acquisition, project, or program.
(9)
(10)
(A) the testing of a capability or asset and the subsystems of the capability or asset to determine whether they meet all contractual performance requirements, including technical performance requirements, supportability requirements, and interoperability requirements and related specifications; and
(B) the evaluation of the results of such testing.
(11)
(A) the testing of a capability or asset and the subsystems of the capability or asset, under conditions similar to those in which the capability or asset and subsystems will actually be deployed, for the purpose of determining the effectiveness and suitability of the capability or asset and subsystems for use by typical Coast Guard users to conduct those missions for which the capability or asset and subsystems are intended to be used; and
(B) the evaluation of the results of such testing.