(a) General authority

(1) In general

The Secretary may carry out a project to restore and protect an aquatic ecosystem or estuary if the Secretary determines that the project—

(A)(i) will improve the quality of the environment and is in the public interest; or

(ii) will improve the elements and features of an estuary (as defined in section 2902 of this title); and

(B) is cost-effective.

(2) Dam removal

A project under this section may include removal of a dam.

(3) Anadromous fish habitat and passage

(A) Measures

A project under this section may include measures to improve habitat or passage for anadromous fish, including—

(i) installing fish bypass structures on small water diversions;

(ii) modifying tide gates; and

(iii) restoring or reconnecting floodplains and wetlands that are important for anadromous fish habitat or passage.

(B) Benefits

A project that includes measures under this paragraph shall be formulated to maximize benefits for the anadromous fish species benefitted by the project.

(b) Cost sharing

(1) In general

Non-Federal interests shall provide 35 percent of the cost of construction of any project carried out under this section, including provision of all lands, easements, rights-of-way, and necessary relocations.

(2) Form

Before October 1, 2003, the Federal share of the cost of a project under this section may be provided in the form of reimbursements of project costs.

(c) Agreements

(1) In general

Construction of a project under this section shall be initiated only after a non-Federal interest has entered into a binding agreement with the Secretary to pay the non-Federal share of the costs of construction required by this section and to pay 100 percent of any operation, maintenance, and replacement and rehabilitation costs with respect to the project in accordance with regulations prescribed by the Secretary.

(2) Nonprofit entities

Notwithstanding section 1962d-5b of title 42, for any project carried out under this section, a non-Federal interest may include a nonprofit entity, with the consent of the affected local government.

(d) Cost limitation

Not more than $10,000,000 in Federal funds may be allotted under this section for a project at any single locality.

(e) Use of natural and nature-based features

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In 33 USC 2330

  • Fiscal year: The fiscal year is the accounting period for the government. For the federal government, this begins on October 1 and ends on September 30. The fiscal year is designated by the calendar year in which it ends; for example, fiscal year 2006 begins on October 1, 2005 and ends on September 30, 2006.

In carrying out a project to restore and protect an aquatic ecosystem or estuary under subsection (a), the Secretary shall consider, and may include, with the consent of the non-Federal interest, a natural feature or nature-based feature, as such terms are defined in section 2289a of this title, if the Secretary determines that inclusion of such features is consistent with the requirements of subsection (a).

(f) Funding

There is authorized to be appropriated to carry out this section $62,500,000 for each fiscal year.

(g) Prioritization

The Secretary shall give projects that include measures described in subsection (a)(3) equal priority for implementation as other projects under this section.