33 USC 702o – Mississippi River and Tributaries Project
Current as of: 2024 | Check for updates
|
Other versions
(a) In general
After any flood event requiring operation or activation of any floodway or backwater feature within the Mississippi River and Tributaries Project through natural overtopping of a Federal levee or artificial crevassing of a Federal levee to relieve pressure on the levees elsewhere in the system, the Secretary shall expeditiously reset and restore the damaged floodway’s levees.
(b) Consultation
In carrying out subsection (a), the Secretary shall provide an opportunity for consultation with affected communities.
(c) Mississippi River and Tributaries Project
The term “Mississippi River and Tributaries Project” means the Mississippi River and Tributaries project authorized by the Act of May 15, 1928 (Chap. 569; 45 Stat. 534).