46 USC 55108 – Platform jackets
(a)
(1)
(2)
(A) platform jackets;
(B) tension leg or SPAR platform superstructures (including the deck, drilling rig and support utilities, and supporting structure);
(C) hull (including vertical legs and connecting pontoons or vertical cylinder);
(D) tower and base sections of a platform jacket;
(E) jacket structures; and
(F) deck modules (known as “topsides”).
Terms Used In 46 USC 55108
- vessel: includes every description of watercraft or other artificial contrivance used, or capable of being used, as a means of transportation on water. See 1 USC 3
(b)
(1) the launch barge was built before December 31, 2000, and has a launch capacity of at least 12,000 long tons; and
(2) the Secretary of Transportation makes a determination, in accordance with procedures established under subsection (c), that a suitable coastwise qualified vessel is not available for use in the transportation and, if needed, launch or installation of a platform jacket.
(c)
(1) on application by an owner or operator for the use of a non-coastwise qualified launch barge for transportation of a platform jacket under this section (which application shall include all relevant information, including engineering details and timing requirements), the Secretary promptly publishes a notice in the Federal Register—
(A) describing the project and the platform jacket involved;
(B) advising that all relevant information reasonably needed to assess the transportation requirements for the platform jacket will be made available to interested parties on request; and
(C) requesting that information on the availability of coastwise qualified vessels be submitted within 30 days after publication of that notice; and
(2)(A) no information is submitted to the Secretary within that 30 day period; or
(B) the owner or operator of a coastwise qualified vessel submits information to the Secretary asserting that the owner or operator has a suitable coastwise qualified vessel available for the transportation, but the Secretary determines, within 90 days after the notice is first published, that the coastwise qualified vessel is not suitable or reasonably available for the transportation.