49 USC 47124 – Agreements for State and local operation of airport facilities
(a)
(b)
(1)
(A)
(B)
(i) for the 1-year period after such determination is made; or
(ii) if an appeal of such determination is requested, for the 1-year period described in subsection (d)(4)(D)..1
(C)
(2)
(3)
(A)
(B)
(i) utilize for purposes of cost-benefit analyses, current, actual, site-specific data, forecast estimates, or airport master plan data provided by a facility owner or operator and verified by the Secretary; and
(ii) approve for participation only facilities willing to fund a pro rata share of the operating costs of the air traffic control tower to achieve a 1-to-1 benefit-to-cost ratio using actual site-specific contract tower operating costs in any case in which there is an operating air traffic control tower, as required for eligibility under the Contract Tower Program.
(C)
(i) Air traffic control towers that are participating in the Contract Tower Program but have been notified that they will be terminated from such program because the Secretary has determined that the benefit-to-cost ratio for their continuation in such program is less than 1.0.
(ii) Air traffic control towers that the Secretary determines have a benefit-to-cost ratio of at least .50.
(iii) Air traffic control towers of the Federal Aviation Administration that are closed as a result of the air traffic controllers strike in 1981.
(iv) Air traffic control towers located at airports or points at which an air carrier is receiving compensation under the essential air service program under this chapter.
(v) Air traffic control towers located at airports that are prepared to assume partial responsibility for maintenance costs.
(vi) Air traffic control towers located at airports with safety or operational problems related to topography, weather, runway configuration, or mix of aircraft.
(vii) Air traffic control towers located at an airport at which the community has been operating the tower at its own expense.
(D)
(E)
(F)
(G)
(4)
(A)
(i) a primary airport—
(I) from amounts made available under sections 47114(c)(1) and 47114(c)(2) for the construction or improvement of a nonapproach control tower, as defined by the Secretary, and for the acquisition and installation of air traffic control, communications, and related equipment to be used in that tower;
(II) from amounts made available under sections 47114(c)(1) and 47114(c)(2) for reimbursement for the cost of construction or improvement of a nonapproach control tower, as defined by the Secretary, incurred after October 1, 1996, if the sponsor complied with the requirements of sections 47107(e), 47112(b), and 47112(c) in constructing or improving that tower; and
(III) from amounts made available under sections 47114(c)(1) and 47114(c)(2) for reimbursement for the cost of acquiring and installing in that tower air traffic control, communications, and related equipment that was acquired or installed after October 1, 1996, including remote air traffic control tower equipment certified by the Federal Aviation Administration; and
(ii) a public-use airport that is not a primary airport—
(I) from amounts made available under sections 47114(c)(2) and 47114(d) for the construction or improvement of a nonapproach control tower, as defined by the Secretary, and for the acquisition and installation of air traffic control, communications, and related equipment to be used in that tower;
(II) from amounts made available under sections 47114(c)(2) and 47114(d)(3)(A) for reimbursement for the cost of construction or improvement of a nonapproach control tower, as defined by the Secretary, incurred after October 1, 1996, if the sponsor complied with the requirements of sections 47107(e), 47112(b), and 47112(c) in constructing or improving that tower; and
(III) from amounts made available under sections 47114(c)(2) and 47114(d)(3)(A) for reimbursement for the cost of acquiring and installing in that tower air traffic control, communications, and related equipment that was acquired or installed after October 1, 1996, including remote air traffic control tower equipment certified by the Federal Aviation Administration.
(B)
(i)(I) the sponsor is a participant in the Federal Aviation Administration Contract Tower Program or the Cost-share Program; or
(II) construction of a nonapproach control tower would qualify the sponsor to be eligible to participate in such program;
(ii) the sponsor certifies that it will pay not less than 10 percent of the cost of the activities for which the sponsor is receiving assistance under this paragraph;
(iii) the Secretary affirmatively accepts the proposed contract tower into a contract tower program under this section and certifies that the Secretary will seek future appropriations to pay the Federal Aviation Administration’s cost of the contract to operate the tower to be constructed under this paragraph;
(iv) the sponsor certifies that it will pay its share of the cost of the contract to operate the tower to be constructed under this paragraph; and
(v) in the case of a tower to be constructed under this paragraph from amounts made available under section 47114(d)(2) or 47114(d)(3)(B), the Secretary certifies that—
(I) the Federal Aviation Administration has consulted the State within the borders of which the tower is to be constructed and the State supports the construction of the tower as part of its State airport capital plan; and
(II) the selection of the tower for funding is based on objective criteria.
(c)
(d)
(1)
(A)
(B)
(i) by more than 25 percent from the previous year; or
(ii) by more than 55 percent cumulatively in the preceding 3-year period.
(2)
(A) The Federal Aviation Administration’s actual cost of wages and benefits of personnel working at the tower.
(B) The Federal Aviation Administration’s actual telecommunications costs directly associated with the tower.
(C) The Federal Aviation Administration’s costs of purchasing and installing any air traffic control equipment that would not have been purchased or installed except as a result of the operation of the tower.
(D) The Federal Aviation Administration’s actual travel costs associated with maintaining air traffic control equipment that is owned by the Administration and would not be maintained except as a result of the operation of the tower.
(E) Other actual costs of the Federal Aviation Administration directly associated with the tower that would not be incurred except as a result of the operation of the tower (excluding costs for noncontract tower-related personnel and equipment, even if the personnel or equipment is located in the contract tower building).
(3)
(4)
(A) The Secretary shall provide the airport (or the State or local government having jurisdiction over the airport) at least 90 days following the date of receipt of the determination to submit to the Secretary a request for an appeal of the determination, together with updated or additional data in support of the appeal.
(B) Upon receipt of a request for an appeal submitted pursuant to subparagraph (A), the Secretary shall—
(i) transmit to the Administrator of the Federal Aviation Administration any updated or additional data submitted in support of the appeal; and
(ii) provide the Administrator not more than 90 days to review the data and provide a response to the Secretary based on the review.
(C) After receiving a response from the Administrator pursuant to subparagraph (B), the Secretary shall—
(i) provide the airport, State, or local government that requested the appeal at least 30 days to review the response; and
(ii) withhold from taking further action in connection with the appeal during that 30-day period.
(D) If, after completion of the appeal procedures with respect to the determination, the Secretary requires the tower to transition into the Cost-share Program, the Secretary shall not require a cost-share payment from the airport, State, or local government for 1 year following the last day of the 30-day period described in subparagraph (C).
(e)
(1)
(2)