In fiscal year 2015 and subsequent fiscal years, the Secretary of Energy shall submit to the congressional defense committees (as defined in U.S.C. 101(a)(16) 1) a report, on each major warhead refurbishment program that reaches the Phase 6.3 milestone, that provides an analysis of alternatives. Such report shall include—

(1) a full description of alternatives considered prior to the award of Phase 6.3;

(2) a comparison of the costs and benefits of each of those alternatives, to include an analysis of trade-offs among cost, schedule, and performance objectives against each alternative considered;

(3) identification of the cost and risk of critical technology elements associated with each alternative, including technology maturity, integration risk, manufacturing feasibility, and demonstration needs;

(4) identification of the cost and risk of additional capital asset and infrastructure capabilities required to support production and certification of each alternative;

(5) a comparative analysis of the risks, costs, and scheduling needs for any military requirement intended to enhance warhead safety, security, or maintainability, including any requirement to consolidate and/or integrate warhead systems or mods as compared to at least one other feasible refurbishment alternative the Nuclear Weapons Council considers appropriate; and

(6) a life-cycle cost estimate for the alternative selected that details the overall cost, scope, and schedule planning assumptions.

Ask a criminal law question, get an answer ASAP!
Click here to chat with a criminal defense lawyer and protect your rights.

Terms Used In 50 USC 2523c

  • Fiscal year: The fiscal year is the accounting period for the government. For the federal government, this begins on October 1 and ends on September 30. The fiscal year is designated by the calendar year in which it ends; for example, fiscal year 2006 begins on October 1, 2005 and ends on September 30, 2006.