7 USC 905 – Fees for certain loan guarantees
Current as of: 2024 | Check for updates
|
Other versions
(a) In general
For electrification baseload generation loan guarantees, the Secretary shall, at the request of the borrower, charge an upfront fee to cover the costs of the loan guarantee.
(b) Fee
Terms Used In 7 USC 905
- Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.
The fee described in subsection (a) for a loan guarantee shall be equal to the costs of the loan guarantee (within the meaning of section 661a(5)(C) of title 2).
(c) Limitation
Funds received from a borrower to pay the fee described in this section shall not be derived from a loan or other debt obligation that is made or guaranteed by the Federal Government.