Florida Statutes 373.0695 – Duties of basin boards; authorized expenditures
Current as of: 2024 | Check for updates
|
Other versions
(1) The various boards shall be responsible for discharging the following described functions in their respective basins:
(a) The preparation of engineering plans for development of the water resources of the basin and the conduct of public hearings on such plans.
Terms Used In Florida Statutes 373.0695
- Real property: Land, and all immovable fixtures erected on, growing on, or affixed to the land.
(b) The development and preparation of overall basin plan of secondary water control facilities for the guidance of subdrainage districts and private land owners in the development of their respective systems of water control which will be connected to the primary works of the basin to complement the engineering plan of primary works for the basin.
(c) The preparation of the annual budget for the basin and the submission of such budget to the governing board of the district for inclusion in the district budget.
(d) The consideration and prior approval of final construction plans of the district for works to be constructed in the basin.
(e) The administration of the affairs of the basin.
(f) Planning for and, upon request by a county, municipality, private utility, or regional water supply authority, providing water supply and transmission facilities for the purpose of assisting such counties, municipalities, private utilities, or regional water supply authorities within or serving the basin.
(2) Basin board moneys shall be utilized for:
(a) Engineering studies of works of the basin.
(b) Payment for the preparation of final plans and specifications for construction of basin works executed by the district.
(c) Payment of costs of construction of works of the basin executed by the district.
(d) Payment for maintenance and operation of basin works as carried out by the district.
(e) Administrative and regulatory activities of the basin.
(f) Payment for real property interests for works of the basin.
(g) Payment of costs of road, bridge, railroad, and utilities modifications and changes resulting from basin works.
(3) The works of the basin shall be those adopted by the respective basin boards. Such works may be adopted jointly with other basins and may be within or without the area of the basin.
(4) In the exercise of the duties and powers granted herein, the basin boards shall be subject to all the limitations and restrictions imposed on the water management districts in s. 373.703.