Florida Statutes 403.9417 – Recording of notice of certified corridor route
Current as of: 2024 | Check for updates
|
Other versions
Terms Used In Florida Statutes 403.9417
- Lien: A claim against real or personal property in satisfaction of a debt.
- Real property: Land, and all immovable fixtures erected on, growing on, or affixed to the land.
Within 60 days after certification of a natural gas transmission pipeline corridor pursuant to ss. 403.9401–403.9425, the applicant shall file, in accordance with s. 28.222, with the clerk of the circuit court for each county through which the corridor will pass, a notice of the certified route. The notice shall consist of maps or aerial photographs in the scale of 1:24,000 which clearly show the location of the certified route and shall state that the certification of the corridor will result in the acquisition of rights-of-way within the corridor. Each clerk shall record the filing in the official record of the county for the duration of the certification or until such time as the applicant certifies to the clerk that all lands required for the natural gas transmission pipeline rights-of-way within the corridor have been acquired within such county, whichever is sooner. The recording of this notice shall not constitute a lien, cloud, or encumbrance on real property.