Indiana Code 14-34-6-13. Schedule for release of bond or deposit
(1) When the operator completes the backfilling, regrading, and drainage control of a bonded area in accordance with the approved reclamation plan, the release of sixty percent (60%) of the bond or collateral for the applicable permit area.
(A) if the land to which the release would be applicable is contributing suspended solids to stream flow or runoff outside the permit area in excess of the requirements set forth in IC 14-34-10-2(b)(13); or
(B) until soil productivity for prime farmland has returned to equivalent levels of yield as nonmined land of the same soil type in the surrounding area under equivalent management practices as determined from the soil survey performed under IC 14-34-3-3(16).
If a silt dam is to be retained as a permanent impoundment under IC 14-34-10-2(b)(11), the appropriate part of the bond may be released under this subdivision if provisions for sound future maintenance by the operator or the landowner are made with the director.
(3) When the operator has successfully completed all surface coal mining and reclamation activities, the release of the remaining part of the bond, but not before the expiration of the period specified for operator responsibility in IC 14-34-10. However, the director may not fully release a bond or deposit until all reclamation requirements of this article are fully met.
[Pre-1995 Recodification Citation: 13-4.1-6-7(g).]
As added by P.L.1-1995, SEC.27.