Indiana Code 36-9-22-4. Taps into sewage works; prerequisites; amounts received under contracts; pay out without appropriation; unauthorized taps; removal and disposal without liability
(1) obtaining the approval of the municipal works board; and
Terms Used In Indiana Code 36-9-22-4
- Appropriation: The provision of funds, through an annual appropriations act or a permanent law, for federal agencies to make payments out of the Treasury for specified purposes. The formal federal spending process consists of two sequential steps: authorization
- Contract: A legal written agreement that becomes binding when signed.
(A) charges made or assessed for the tap, use, or deposit, or for the sewers constructed in connection with the tap, use, or deposit; and
(B) the amount required by the contract.
All amounts received by the municipality under the contract shall be paid out, without appropriation, under the terms of the contract within sixty (60) days after they are received.
(b) Whenever any tap or connection is made in violation of subsection (a), the works board shall:
(1) remove or cause to be removed the unauthorized tap or connection and all connecting tile located in the right-of-way for the sewage works; and
(2) dispose of the unauthorized materials that are removed, without any liability on the part of the municipality.
[Pre-Local Government Recodification Citation: 19-2-7-18.]
As added by Acts 1981, P.L.309, SEC.95.