Indiana Code 36-9-40-13. Construction contract for entire system; challenge to contract
Current as of: 2024 | Check for updates
|
Other versions
Sec. 13. (a) The contract for construction of a system must be for construction of the entire system.
(b) After the execution of a contract for construction of a system, the validity of the contract may be questioned only in an action to enjoin the performance of the contract. This action must be brought before the actual commencement of work under the contract.Terms Used In Indiana Code 36-9-40-13
As added by P.L.7-2002, SEC.1.