Indiana Code 5-30-6-2. Design criteria developer; conflict of interest
Current as of: 2024 | Check for updates
|
Other versions
Sec. 2. (a) The design criteria developer shall prepare the design criteria package.
(b) The design criteria developer may not submit a proposal or furnish design or construction services under the contract.Terms Used In Indiana Code 5-30-6-2
(c) The design-builder may not delegate or subcontract design services or construction services under the design-build contract to the design criteria developer.
As added by P.L.74-2005, SEC.1.