Indiana Code 5-30-7-9. Ownership of drawings, specifications, and information
Current as of: 2024 | Check for updates
|
Other versions
Sec. 9. (a) Unless and until a proposal is accepted, the drawings, specifications, and other information in the proposal are the property of the offeror.
(b) After a proposal is accepted, ownership of the drawings, specifications, and information in the drawings and specifications shall be determined under Indiana law and the terms of the design-build contract.Terms Used In Indiana Code 5-30-7-9
As added by P.L.74-2005, SEC.1.