Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Indiana Code 8-17-1-18

  • Contract: A legal written agreement that becomes binding when signed.
  • department: refers to the Indiana department of transportation. See Indiana Code 8-17-1-0.1
  • highway: includes highways, roads, streets, bridges, tunnels, and approaches. See Indiana Code 8-17-1-1.2
   Sec. 18. Whenever any highway is completed, the inspector, surveyor, or engineer shall file a sworn statement with the county auditor stating that the highway has been completed according to plans, plats, profiles, specifications, and contract and that the quantity and quality of material used in making the improvement was as required under standards and tests of the department. A competent materials testing engineer shall determine in a report whether the tests and standards as to the quality of materials has been met. The materials testing engineer shall file a copy of the report with the county auditor.

Formerly: Acts 1919, c.112, s.19. As amended by Acts 1980, P.L.74, SEC.299; P.L.86-1988, SEC.82.