Iowa Code 468.114 – Passing drainage equipment across railway
Current as of: 2024 | Check for updates
|
Other versions
Terms Used In Iowa Code 468.114
- appraisers: shall mean the persons appointed and qualified to ascertain the value of all land taken and the amount of damage arising from the construction of levee or drainage improvements. See Iowa Code 468.3
- Cost: means the same as defined in section 384. See Iowa Code 468.585
- Damages: Money paid by defendants to successful plaintiffs in civil cases to compensate the plaintiffs for their injuries.
- Jurisdiction: (1) The legal authority of a court to hear and decide a case. Concurrent jurisdiction exists when two courts have simultaneous responsibility for the same case. (2) The geographic area over which the court has authority to decide cases.
It shall be the duty of any steam or electric railway company to furnish the contractor unrestricted passage across its right-of-way, telegraph, telephone, and signal lines for the contractor’s machines and equipment, whenever recommended by the engineer and approved by the board of supervisors, and the cost thereof shall be considered as an element of such company’s damages by the appraisers thereof; provided that if such company shall fail to do so within thirty days after written notice from the auditor, the engineer shall cause the same to be done under the engineer’s direction and the company shall be liable for the cost thereof to be collected by the county in any court having jurisdiction. Provided, further, that the railway company shall have the right to designate the day and hours thereof within said period of thirty days above mentioned when such crossing shall be made.