(1) Beginning with the 2000-2002 biennium and each biennium thereafter, the authority shall submit to the General Assembly a six (6) year program of preconstruction and construction activities to maintain or increase water available within the Kentucky River. The program shall include a two (2) year construction component that shall be implemented as authorized by the General Assembly in the authority’s biennial budget and a four (4) year preconstruction component that shall advise the General Assembly of the consistency of ongoing and long-term planning with the construction activities funded by the General Assembly.
(2) The program shall be developed by considering, at a minimum, the following factors:
(a) The population to be served by the available water;
(b) The social, economic, and environmental impact of program elements; (c) The condition of existing facilities critical to water availability;
(d) The cost of maintaining, improving, replacing, or removing facilities; and
(e) The dependence of communities within the river basin on specific Kentucky
River dam pools or other sources of water.
(3) The program shall include a four (4) year planning document setting out preconstruction activities that include planning and design and an environmental analysis of projects to maintain or increase water available within the Kentucky River and geotechnical and stability evaluations of the Kentucky River locks and dams.
(4) The authority shall provide to the General Assembly a long-range planning document consisting of twenty (20) years for water supply projects being considered by the authority.
(5) The authority shall be responsible for the execution of each six (6) year program as approved and authorized in the budget by the General Assembly and shall report any anticipated deviations from the authorized construction funding or preconstruction program to the Interim Joint Committee on Appropriations and Revenue.
Effective: July 14, 2000
History: Created 2000 Ky. Acts ch. 265, sec. 6, effective July 14, 2000; and ch. 287, sec. 6, effective July 14, 2000.
Legislative Research Commission Note (7/14/2000). This section was created by 2000
Ky. Acts chs. 265 and 287, which are identical and have been codified together.
(2) The program shall be developed by considering, at a minimum, the following factors:
Terms Used In Kentucky Statutes 151.728
- Biennium: means the two (2) year period commencing on July 1 in each even- numbered year and ending on June 30 in the ensuing even-numbered year. See Kentucky Statutes 446.010
- Joint committee: Committees including membership from both houses of teh legislature. Joint committees are usually established with narrow jurisdictions and normally lack authority to report legislation.
- Year: means calendar year. See Kentucky Statutes 446.010
(a) The population to be served by the available water;
(b) The social, economic, and environmental impact of program elements; (c) The condition of existing facilities critical to water availability;
(d) The cost of maintaining, improving, replacing, or removing facilities; and
(e) The dependence of communities within the river basin on specific Kentucky
River dam pools or other sources of water.
(3) The program shall include a four (4) year planning document setting out preconstruction activities that include planning and design and an environmental analysis of projects to maintain or increase water available within the Kentucky River and geotechnical and stability evaluations of the Kentucky River locks and dams.
(4) The authority shall provide to the General Assembly a long-range planning document consisting of twenty (20) years for water supply projects being considered by the authority.
(5) The authority shall be responsible for the execution of each six (6) year program as approved and authorized in the budget by the General Assembly and shall report any anticipated deviations from the authorized construction funding or preconstruction program to the Interim Joint Committee on Appropriations and Revenue.
Effective: July 14, 2000
History: Created 2000 Ky. Acts ch. 265, sec. 6, effective July 14, 2000; and ch. 287, sec. 6, effective July 14, 2000.
Legislative Research Commission Note (7/14/2000). This section was created by 2000